MESSAGE
If you have any questions, please contact us and we will contact you as soon as possible.
◉ Product Introduction
◉ Main Features
*Full line connection: Multiple belts from the mine to the shipment are centrally interlocked and connected with the DCS system to achieve unmanned continuous production;
*Long distance elevated layout: Steel truss corridors span roads, ravines, and factory buildings, with handrails for easy inspection;
*Heavy duty and durable: heavy-duty roller set, large-diameter reversing drum, suitable for grinding materials such as clinker and slag;
*Environmental dust sealing: The entire line is covered with rainproof covers or enclosed corridors, combined with guide chute dust removal, to meet the ultra-low emission requirements of the cement industry;
*Reliable operation: Key parts are equipped with protective switches such as tension ropes, deviation, slippage, and material flow, and automatic alarm and shutdown are triggered in case of faults.
◉Specification parameters (common range)
◉ Applicable scenarios
Suitable for long-distance transportation of limestone in cement plants, transportation of clinker and mixed materials, bulk storage and shipment of finished cement, shared transportation system between aggregate and cement lines, etc. It is also suitable for large-scale bulk material transportation projects in the same building materials and metallurgical industries (such as the Yongfeng Cement project site).
◉ SIMILAR RECOMMENDED

Thank you very much for writing to us. Please leave your message and contact information, we will reply to you within 24 hours.